Campbell SC932C 9-Pin Instrukcja Obsługi

Przeglądaj online lub pobierz Instrukcja Obsługi dla Stacje pogodowe Campbell SC932C 9-Pin. Campbell SC932C 9-Pin Instruction manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 1 - INSTRUCTION MANUAL

TLX106 WEATHER STATIONINSTRUCTION MANUAL3/01COPYRIGHT (c) 1993-2001 CAMPBELL SCIENTIFIC, INC.

Strona 2 - This is a blank page

Section 1. Preparation and Siting1-21.2.1 Tools for Tower InstallationAll TowersShovelRakeOpen end wrenches: 3/8", 7/16", ½", (2) 9/1

Strona 3 - Warranty and Assistance

Section 1. Preparation and Siting1-31.2.3 Supplies for Power and Communications OptionsAC PowerWire, conduit, and junction boxes as neededPhone Mode

Strona 4

Section 1. Preparation and Siting1-4Situations to avoid include:• large industrial heat sources• rooftops• steep slopes• sheltered hollows• high

Strona 5 - Table of Contents

Section 1. Preparation and Siting1-5(Section 1.4.1). A general map showing magnetic declination for the contiguousUnited States is shown in Figure 1

Strona 6

Section 1. Preparation and Siting1-6Telephone numbers:Phone Number Baud Rates303-273-8672 2400303-273-8673 1200303-273-8678 1200Upon carrier-signal d

Strona 7

Section 1. Preparation and Siting1-7Exiting:Press "Cntrl-Z" to exit GEOMAG.When the main menu reappears either select another option or typ

Strona 8

Section 1. Preparation and Siting1-8FIGURE 1.4-3. Declination Angles West of True North Are Added to 0to Get True North

Strona 9 - 1.2 Tools Required

2-1Section 2. TLX106 Tower InstallationDo not install near power lines. If any part of the towercomes in contact with power lines you could beKILLED

Strona 10

Section 2. TLX106 Tower Installation2-22.1 Base Installation2.1.1 Supplied Components(3) ½ inch L-Bolts(9) ½ inch Nuts(1) Anchor TemplateRefer to S

Strona 11 - 1.3 Siting and Exposure

Section 2. TLX106 Tower Installation2-3D TO O OLTOO T DLLTTLTOTO FIGURE 2.1-2. TLX106 Tower Base Installation2.2 Tower Installation2.2.1 Supplied

Strona 12 - MADE IN USA

This is a blank page.

Strona 13

Section 2. TLX106 Tower Installation2-44. Cut and save a 9 inch piece of 12 AWG ground wire from the 12 footlength provided. Thread the remaining 1

Strona 14 - [current date]:

Section 2. TLX106 Tower Installation2-52.3.2 Grounding ProcedureGround the tower as shown in Figure 2.2-1.1. Place the ground rod clamp on the rod.

Strona 15

This is a blank page.

Strona 16

3-1Section 3. TLX106 InstrumentationInstallationThe weather station datalogger, power supply, sensor connection panel, communicationsdevices, and dat

Strona 17

Section 3. TLX106 Instrumentation Installation3-23.1 Enclosure, Datalogger, Power Supply3.1.1 Battery Option InstallationSFIGURE 3.1-1. Rechargeab

Strona 18 - 2.1 Base Installation

Section 3. TLX106 Instrumentation Installation3-3The solar panel should be oriented to receive maximum insolation overthe course of the year. Sugges

Strona 19 - 2.2 Tower Installation

Section 3. TLX106 Instrumentation Installation3-4ORTH FIGURE 3.1-3. Mounting and Grounding the TLX106 Enclosurec) Slide the enclosure to the top of

Strona 20 - 2.3 Tower Grounding

Section 3. TLX106 Instrumentation Installation3-5EarthGroundStand offConnector#4SensorsTEMPCS615TEMPRAIN(PRECIP)TEMP / RHSOLARRADIATIONCOMMWS/WDSDI 1

Strona 21 - 2.3.2 Grounding Procedure

Section 3. TLX106 Instrumentation Installation3-6If you received a telecommunications kit separate from the TLX106 Enclosure,follow the "Interna

Strona 22

Section 3. TLX106 Instrumentation Installation3-73.3.1.2 External InstallationThe following modem kit components are used to make the externalconnec

Strona 23 - Installation

Warranty and AssistanceThe TLX106 WEATHER STATION is warranted by CAMPBELLSCIENTIFIC, INC. to be free from defects in materials and workmanshipunder n

Strona 24

Section 3. TLX106 Instrumentation Installation3-83. Connect the SC932C 9-pin port to the internal TLX106 Enclosure 9-pinport with the blue ribbon cab

Strona 25 - 3.1.4 Enclosure Installation

Section 3. TLX106 Instrumentation Installation3-9- RCV (white)- RCV (black)+ RCV (green)+ RCV (red)+ XMT (red)+ XMT (green)- XMT (black)- XMT (white)

Strona 26 - 3.2 Sensor Connection

Section 3. TLX106 Instrumentation Installation3-10DO NOT EATUNITED DESICCANTS-GATES101CHRISTINE, BELEN, NEW MEXICO 87002DESI PAKSPECIFICATION MIL-D-3

Strona 27

4-1Section 4. TLX106 Sensor ArmInstallation4.1 Components(1) TLX106 Sensor Arm(1) Met One 034A Wind Sensor(1) 034A Mounting Shaft(1) Radiation Shiel

Strona 28 - 3.3.1 Phone Modems

Section 4. TLX106 Sensor Arm Installation4-24.3 Sensor ConnectionRefer to Section 3 for sensor connection details.4.4 034A Wind Sensor Installation

Strona 29 - 3.3.2 Short-Haul Modem

Section 4. TLX106 Sensor Arm Installation4-34.5 RH and Temperature Radiation ShieldMount the radiation shield to the sensor arm as shown in Figure 4

Strona 30

Section 4. TLX106 Sensor Arm Installation4-4InputLocation ParameterNormal Range1 Enclosure Close to airTemperature (°C) temperature3 Solar Radiation

Strona 31 - TLX106 ENCLOSURE

Section 4. TLX106 Sensor Arm Installation4-5123456Air Temperature andRelative HumiditySensorConnectorPinDataloggerRelative Humidity (0-1VDC)Air Tempe

Strona 32 - DESI PAK

Section 4. TLX106 Sensor Arm Installation4-6Solar RadiationSensor40.2 - 90.2 OHMConnectorPinDatalogger132Not UsedNot UsedNot Used3 H3 LGShield4561234

Strona 33 - Section 4. TLX106 Sensor Arm

5-1Section 5. Software Installation andSettings5.1 Measure Sensors and Process DataA pre-written datalogger program (PN 14079) comes installed in th

Strona 35 - 4.6 Pyranometer

Section 5. Software Installation and Settings5-2Here again the Communications Enabled button must be selected. Thenselect the proper Modem Type and

Strona 36 - 4.8 Sensor Schematics

Section 5. Software Installation and Settings5-3The final termination must be to a CR10X-TD logger. The Proline willdefault to work with a logger na

Strona 37 - Wind Speed and Wind Direction

Section 5. Software Installation and Settings5-4If not already started, start the LoggerNet server by double clicking theblue icon. Then start the C

Strona 38 - Tipping Rain Bucket

Section 5. Software Installation and Settings5-5“Keep Logger On Line” This is used to force LoggerNet to stayconnected to the station the entire time

Strona 39 - Settings

Section 5. Software Installation and Settings5-6Now reopen Net Admin and go to the logger previously set up. Nowwe will check to see if the Table De

Strona 40

Section 5. Software Installation and Settings5-75.3 Create MessagePerform the following steps using the Message Editor provided inProLine Software:1

Strona 41

Section 5. Software Installation and Settings5-8FIGURE 5.3-2. The available options provided by the source menu are shown.FIGURE 5.3-3. When the we

Strona 42

6-1Section 6. Maintenance andTroubleshootingThese guidelines apply to several Campbell Scientific weather stations.6.1 MaintenanceProper maintenance

Strona 43

Section 6. Maintenance and Troubleshooting6-26.1.4 Sensor MaintenanceSensor maintenance should be performed at regular intervals, depending on thede

Strona 44

Section 6. Maintenance and Troubleshooting6-32. Punch a very small hole in the bottom of the can.3. Place the can in the top funnel of the rain gage

Strona 45 - 5.3 Create Message

iTLX106 Weather StationTable of Contents1. Preparation and Siting1.1 Installation Tasks ...

Strona 46

Section 6. Maintenance and Troubleshooting6-4At the computer:D. Make sure the Station File is configured correctly.E. Check the cable(s) between the

Strona 47 - Troubleshooting

TLX106 Weather Station Table of Contentsii4.6 Pyranometer ...4

Strona 48 - 6.1.4 Sensor Maintenance

TLX106 Weather Station Table of Contentsiii5.3-1 ProLine software provides an easy-to-use message editor ...5-75.3-2 The available opti

Strona 49 - 6.2 TroubleShooting

This is a blank page.

Strona 50

1-1Section 1. Preparation and SitingThese guidelines apply to several Campbell Scientific weather stations.1.1 Installation tasks1.1.1 Indoors• Im

Komentarze do niniejszej Instrukcji

Brak uwag